Advertisement

Building Jarrett Bay’s 77′ Mama Who: Part 4

img_4163.jpg
We have been following the construction of Jarrett Bay’s 77-foot Mama Who since its beginning. Here, we continue our inside look at the Jarrett Bay yard. When you are done, be sure to check out parts 1, 2, and 3 as well. Mama Who heads for the new tent. —All photos courtesy Jarrett Bay Picasa
img_4167.jpg
Heading for the new tent. Picasa
img_4183.jpg
Picasa
img_4199.jpg
Top view Picasa
2012-12-04-09-18-09.jpg
Removing the house roof and salon floor. Picasa
2012-12-04-09-19-04.jpg
A look into the engine room. Picasa
2012-12-04-09-33-41.jpg
One MTU V16 on its way. Picasa
2012-12-04-09-35-16.jpg
Tate directs traffic. Picasa
2012-12-04-10-16-09.jpg
Starboard-side motor in place. Picasa
photo-1.jpg
Reapplying the bridge.
photo7.jpg
Reapplying the bridge.
mtu-gopro.jpg
A cool look at her MTU V16s.
gopr0011.jpg
Moving into the tent. Picasa
gopr0014.jpg
Moving into the tent. Picasa
gopr0010.jpg
Moving into the tent. Picasa
gopr0017.jpg
Moving into the tent. Picasa
gopr0021.jpg
Moving into the tent. Picasa
gopr0023.jpg
DCIM\100GOPRO Picasa
img_4290.jpg
Cherry countertops in her master stateroom. Picasa
img_4294.jpg
Cherry tops in the vee. Picasa
img_4296.jpg
Console and bridge seating get tabbed on. Picasa
img_4301.jpg
Picasa
img_4379.jpg
Drink and bait box get dropped in. Picasa
img_4153.jpg
Josh dry fits the companionway steps. Picasa
img_4380.jpg
Salon Picasa
img_4381.jpg
Picasa
img_4382.jpg
Picasa
img_4385.jpg
Cabin molding Picasa
img_4388.jpg
Varnish in staterooms Picasa
img_4389.jpg
Picasa
img_4390.jpg
The third bunk and cabinetry are hung in the starboard stateroom. Picasa
img_4527.jpg
Freezer compartments in the forward bridge console.
img_4528.jpg
Platform aft of the bridge console. Picasa
img_4525.jpg
Putty in the bridge. Picasa
img_4526.jpg
Picasa
img_4531.jpg
Mezzanine tackle cabinet Picasa
img_4534.jpg
Stateroom side table with dove-tail drawers.
img_4535.jpg
Salon valance gets clamped up. Picasa
img_4524.jpg
Fairing the hull sides. Picasa
img_4554.jpg
Mezzanine ice boxes Picasa
img_4555.jpg
Full cherry doors await the varnishing process. Picasa
img_4560.jpg
Charlie works on the teak mezzanine tackle cabinet. Picasa
img_4570.jpg
Cummins generators are set inside the boat. Picasa
img_4574.jpg
A couple of coats of epoxy go on the cabin molding. Picasa
img_4575.jpg
Epoxy coats go on the teak of the salon bulkhead. Picasa
img_4645.jpg
A primer coat goes over the entire boat, with hawsepipe construction in the transom. Picasa
img_4647.jpg
Chris puts on the icebox lids. Picasa
img_4648.jpg
The covering boards get glued down. Picasa
img_4650.jpg
Salon progress Picasa
img_4652.jpg
Picasa
img_4653.jpg
Picasa
img_4659.jpg
Finish paint in the showers and head progress. Picasa
img_4654.jpg
Brooks does some wiring in the pump room. Picasa
img_4656.jpg
Top coat gets buffed in the pump room. Picasa
img_4658.jpg
A little electrical action in the engine room (aft bulkhead). Picasa
img_4660.jpg
Access valves in the bilge. Picasa
img_4664.jpg
Primer in the bridge. Picasa
img_4665.jpg
Primer on the whole boat. Picasa
Advertisement

Free Email Newsletters

Sign up for free Marlin Group emails to receive expert big-game content along with key tournament updates and to get advanced notice of new expeditions as they’re introduced.

Advertisement